Hydrocarbon Well Plugging 7/2/2019

On July 1, HWS tripped in hole (TIH) to 1769′  mixed and pumped 6 (bbl) barrel of gel, then set a balanced class A cement plug from 1769 to 1625, displaced plug with 4 (bbl) gel. Trip out of hole (TOOH) on the Eqt WV well.
On July 1, HWS mobilized drill string and power swivel unit a PA well. Set up drilling equipment and prep to begin clean out.
On July 1, HWS drilled from 1954′ to 2279′ on the Odnr well with 7 7/8″ tricone tooth bit.