Hydrocarbon Well Plugging Work 6/17/2019

On June 17 HWS began site prep on the nw well. Hauled rig mats down to pad over gas line.
 
On June 17, HWS set cement plug back up to 1100′, tripped out of hole (TOOH) with work string on the PA Eqt well.
 
On June 17, HWS placed cutting box inside pit, circulated pit through cutting box to clean cuttings out of drill mud on the ODNR well. Tripped in work string, circulated hole and will go back drilling in the morning.
Best oil and gas well pluggers in the nation. We do the toughest jobs in the tightest locations. Well plugging is all we do. Have us plug your next well.