Hydrocarbon Well Plugging update

Set plugs today, will try to cement back tomorrow from 650′ to surface.
Ohio milled down to 1318′ with the 4.5″ casing, not going good, they think the tubing is twisting up inside the 4.5″. Plan tomorrow is set cement plug at that depth.
Got two loads oil hauled today, tank off glannon well and hauled to Barnett well, dike cut out and old Barnett tank ready to be moved. Tomorrow they will remove that tank and plumb in tank from Glannon and dike.

Rig plugging work