Hydrocarbon Well Services Daily Blog 5/20/2019

Hydrocarbon Well Services checked total depth (Td) on the Civil Environmental Consultants well (CEC). Freepoint 7″ casing and trip in hole (TIH) with work string to set bottom hole well plug in the morning.
Hydrocarbon Well Services checked top of cement (TOC) on the Duquene Light Company’s (DLC) well at 648′. Rig up (RU) wireline, shoot and perforate 5.5″ casing. Trip out of hole (TOOH) with 5.5″ casing.Trip in hole with work string (TIH) to 648′ and prep to  cement to surface (CTS) in the morning.
 
Hydrocarbon Well Services checked top of cement (TOC) on the Odnr well at 115′, pulled up on 7″ casing to make sure it was still free. Trip in hole (TIH) with work string to 115′ and prep to cement to surface (CTS) in the morning.