July 24, 2019 Hydrocarbon Well Services Rigged up to plug wells with cement

On July 24, HWS milled on the 5.5″ casing and got topped dressed up. Change out bit to 4 3/4″ concave mill and start in hole, sat down at 33′ and ready to mill on blockage on the well in WV.
Pit on location
Pit on location
Rigged Up Double Pole
Rigged Up Double Pole

On July 24, HWS got the 3″ tubing to blow down, checked td and scheduled wireline truck for tomorrow on the well in PA.

 
On July 24, HWS finished spotting equipment on containment, opened well and blew down into pit. Filled 100 bbl water tank and excavated around well in OH.
 
On July 24, a representative from Hydrocarbon flagged out access and location for upcoming project in PA. Completed 811 call