July 30, 2019 Hydrocarbon Well Services Turn Key Plugging and reclamation of well sites

On July 31, HWS ran bond log inside 5.5″ casing, bond log showed casing was bonded. Perforate as directed, trip in and set cement plug. Hauled back to shop on our way in the hydraulic unit, pumps, elevators, and tools we were done with.Tomorrow will check plug and set plug on well in WV.
Double Pole Rigged Up
Double Pole Rigged Up

 

On July 31, HWS checked plug, tripped in and set plug, let plug set and checked that plug, tripped out of hole and prep to run bond log inside 7 inch in the morning on the well in PA. 1 pic
Wireline Shots
Wireline Shots
On July 31, HWS completed seeding and mulching in OH. Will be repairing rig tomorrow and checking td.
Boggess slip repair has been seeded and mulched. We have currently moved 87 loads of oil, will keep pushing as long as oil stays up.
Well tenders are changing charts tomorrow.