On May 29, Hydrocarbon Well Service completed cementing back to surface on the Civil Environmental Consultants well. Began loading up…
chadeverson1
Hydrocarbon Well Services checked Top of Cement (TOC) @ 200′ on the CivilĀ Environmental Consultants (CEC )well. Topped off plug…
Hydrocarbon Well Services perforated the 7″ casing with 5 shots each at 765′, and 232′. Tripped in hole with tubing,…
Hydrocarbon Well Services set a 200′ bottom hole plug on the CivilĀ Environmental Consultants well. Tripped out of hole (TOOH)…
Hydrocarbon Well Services checked total depth (Td) on the Civil Environmental Consultants well (CEC). Freepoint 7″ casing and trip in…
Hydrocarbon Well Services pumped H20 down the Duquene Light Company’s (DLC) well to kill gas. Got gas killed on the…
Hydrocarbon Well Services sat surface plug on CEC well and began rigging down. Hydrocarbon Well Services tripped out 7″ casing…
Hydrocarbon Well Services tripped in hole to 1876′ and sat a 500′ cement wellplug, tripped out and waited on cement…
Hydrocarbon Well Services perforated casings in well that would not pull. Inspector requested shots every 50′, shot a total of…
Hydrocarbon Well Services tripped in work string and set a 624′ well cement plug and tripped work string back out…

