Oil and Gas Well Plugging and Capping News and Information

Daily Blogs about Hydrocarbon Well Services oil and gas well plugging and capping services.

Plugging a well
Plugging a well
HWS continued stripping tubing and rods, utilizing mud bucket to keep all fluid contained while stripping out of hole on
Plugging a well
Plugging a well
1/30/2020 HWS set cement plug, took 400 psi to break circulation and 250 psi to pump plug. Displace and tripped
Plugging a well
Plugging a well
HWS pulled rods out of the well for Big Sand, rebuilding pump and will trip pump and rods back in
Plugging a well
Plugging a well
HWS moved on Big dand well, cut pump jack off stand, load and move out of way. Spot rig and
Plugging a well
Plugging a well
Hws completed swabbing well in Morgantown, moved rig back to Clarksburg to begin rid job for Big Sand.    HWS
Plugging a well
Plugging a well
HWS checked top of cement, began pulling 4.5" casing. String weight of casing went above 30,000, should only be 13,000.
Plugging a well
Plugging a well
HWS killed gas off well in Armstrong PA, and ran bond log. Got permission from inspector to set cast iron
Hydrocarbon plugs many wells for the Ohio Department of Natural Resources through its Orphan well program. Hydrocarbon also plugs wells
Plugging a well
Plugging a well
Armstong PA - HWS pumped 100 bbl water down tubing to kill gas, checked Td and ran bond log inside