HWS done production work for Big Sand, swabbed 4.5″ casing. Filled tank, called to have tank hauled. Will haul…
NCWVmedia
HWS checked TOC on the well in Pleasants County at 42′, tripped in, topped off cement, tripped out and pumped…
On August 7th, HWS began cleaning out cement inside 8 5/8″ casing with a 7 7/8″ tricone bit on the…
In WV, HWS checked TOC @ 52′, trip in hole, set cement plug back to surface. Will check cement…
On July 31, HWS ran bond log inside 5.5″ casing, bond log showed casing was bonded. Perforate as directed, trip…
On July 24, HWS milled on the 5.5″ casing and got topped dressed up. Change out bit to 4 3/4″…
On July 1, HWS tripped in hole (TIH) to 1769′ mixed and pumped 6 (bbl) barrel of gel, then set…
On June 17 HWS began site prep on the nw well. Hauled rig mats down to pad over gas line….