Oil and Gas Well Plugging and Capping News and Information

Daily Blogs about Hydrocarbon Well Services oil and gas well plugging and capping services.

Rigged Up Double Pole
Rigged Up Double Pole
On July 24, HWS milled on the 5.5" casing and got topped dressed up. Change out bit to 4 3/4"
On July 1, HWS tripped in hole (TIH) to 1769'  mixed and pumped 6 (bbl) barrel of gel, then set
Hydrocarbon Well Services Cement Plugging
Hydrocarbon Well Services Cement Plugging
On June 17 HWS began site prep on the nw well. Hauled rig mats down to pad over gas line.
On June 6, 2019 Hydrocarbon Well Service checked cement on 10 3/4'' casing on the Odnr well, spot rig back
Hydrocarbon Well Services Plugging and Cementing
Hydrocarbon Well Services Plugging and Cementing
On May 29, Hydrocarbon Well Service completed cementing back to surface on the Civil Environmental Consultants well. Began loading up
Hydrocarbon Well Services checked Top of Cement (TOC) @ 200' on the Civil  Environmental Consultants (CEC )well. Topped off plug
Hydrocarbon Well Services perforated the 7" casing with 5 shots each at 765', and 232'. Tripped in hole with tubing,
Hydrocarbon Well Services set a 200' bottom hole plug on the Civil  Environmental Consultants well. Tripped out of hole (TOOH)
Well-Plugging-1
Well-Plugging-1
Hydrocarbon Well Services checked total depth (Td) on the Civil Environmental Consultants well (CEC). Freepoint 7" casing and trip in