Daily Blogs about Hydrocarbon Well Services oil and gas well plugging and capping services. July 24, 2019 Hydrocarbon Well Services Rigged up to plug wells with cement On July 24, HWS milled on the 5.5" casing and got topped dressed up. Change out bit to 4 3/4" Hydrocarbon Well Plugging 7/2/2019 On July 1, HWS tripped in hole (TIH) to 1769' mixed and pumped 6 (bbl) barrel of gel, then set Hydrocarbon Well Plugging Work 6/17/2019 On June 17 HWS began site prep on the nw well. Hauled rig mats down to pad over gas line. Hydrocarbon Well Plugging Report 6/6/2019 On June 6, 2019 Hydrocarbon Well Service checked cement on 10 3/4'' casing on the Odnr well, spot rig back Hydrocarbon Well Plugging Recent Activity 6/3/2019 On May 29, Hydrocarbon Well Service completed cementing back to surface on the Civil Environmental Consultants well. Began loading up Hydrocarbon Well Services Daily Blog 5/28/19 Hydrocarbon Well Services checked Top of Cement (TOC) @ 200' on the Civil Environmental Consultants (CEC )well. Topped off plug Hydrocarbon Well Services Daily Blog 5/22/2019 Hydrocarbon Well Services perforated the 7" casing with 5 shots each at 765', and 232'. Tripped in hole with tubing, Hydrocarbon Well Services Daily Blog 5/21/2019 Hydrocarbon Well Services set a 200' bottom hole plug on the Civil Environmental Consultants well. Tripped out of hole (TOOH) Hydrocarbon Well Services Daily Blog 5/20/2019 Hydrocarbon Well Services checked total depth (Td) on the Civil Environmental Consultants well (CEC). Freepoint 7" casing and trip in « Previous 1 … 4 5 6 7 8 … 13 Next »