Daily Blogs about Hydrocarbon Well Services oil and gas well plugging and capping services. Hydrocarbon Well Plugging Update October 1, 2019 Armstong PA - HWS pumped 100 bbl water down tubing to kill gas, checked Td and ran bond log inside Hydrocarbon Well Plugging update Set plugs today, will try to cement back tomorrow from 650' to surface. Ohio milled down to 1318' with the Hydrocarbon Well Plugging Update September 12,2019 HWS power swiveled on the well in Armstrong PA. Made 35' of hole using a 4 7/8" tri cone mill. Sept 3 Hydrocarbon Well Plugging, Sealing and Cementing Report HWS checked top of cement at 2716', tripped in workstring and set a 120 sack (600') plug on the well August 20, 2019 Hydrocarbon Well Plugging, Sealing, and Cementing Wells HWS done production work for Big Sand, swabbed 4.5" casing. Filled tank, called to have tank hauled. Will haul August 12, 2019 Hydrocarbon Well Services Capped, Plugged, Sealed and Cemented Oil and Gas Wells HWS checked TOC on the well in Pleasants County at 42', tripped in, topped off cement, tripped out and pumped August 7th Hydrocarbon Well Plugging Services update cementing, plugging oil and gas wells On August 7th, HWS began cleaning out cement inside 8 5/8" casing with a 7 7/8" tricone bit on the August 5, 2019 Hydrocarbon Well Services Plugging and Cementing Wells In WV, HWS checked TOC @ 52', trip in hole, set cement plug back to surface. Will check cement July 30, 2019 Hydrocarbon Well Services Turn Key Plugging and reclamation of well sites On July 31, HWS ran bond log inside 5.5" casing, bond log showed casing was bonded. Perforate as directed, trip « Previous 1 … 3 4 5 6 7 … 13 Next »